background image

INST

ALL

A

TION 

MAN

UAL

 

6. Electrical Installation 

Caution 

1)  Electrical  risks  must  be  prevented  during  installation,  distribution, 

generation, and maintenance of PV module. 

2)  During  installation  of  PV  module,  system  voltage  should  not  exceed 

[IEC1000V]. 

3)  When  installing  the  system,  use  same  rate  of    model  [If  you  use  a 

electrically  and  physically  different  type  of  module,  output  capacity  or 

system performance may be reduced due to fire]. 

4) When wiring, you should connect polarity appropriately, and if not, it can 

cause  abnormal  generation  performance  and  PV  module  degradation  by 

fire. 

5) For the reverse current value, refer the Fuse rating value specified in “9. 

Detailed  module  specification’.  If  exceed  its  value,  connect  the  rated 

overcurrent  protective  device(permitted  by  local  regulation)  to  the 

module string in series wiring. 

6) Junction box is in the rear surface of the module. This box is an important 

device  for  the  module  generation,  and  never  unpack  it  in  any 

circumstance in the field. 

    [Once the junction box is opened, warranty will be invalidated. ] 

7)  If  the  PV  module  have  any  electrical  problem,  you  should  inspect  the 

module according to the warranty term provided by S-Energy, and return 

it to S-Energy for repair and replacement.  

Material : 

All the wire for the PV module connection should be configured with PV cable only

.  

[Cable  for  PV  :  double  insulation,  UV  resistance,  temperature  resistant  for  more  than  minimum  90

  ]  Use  copper 

wire for all wiring. 

Diameter: At least larger than minimum 12AWG [4

]  

[wiring  diameter  should  confirm  the  local  regulation,  and  S-Energy  Co.,  Ltd.  recommends    the  customer  use    wires 
with a diameter larger than the above number at minimum.] 

Module configuration[Series wiring] 

[((Min  Temp 

–  25

)  x  (Voc  x  -Temperature  coefficient  of  Voc))  +  Voc]  x  Panels  per  string  =  Maximum  system 

Voltage 
[To guarantee the maximum voltage limitation condition, ensure the general temperature condition according to the  
National Electric Code (690.7)  

 

| Series Wiring| 

 
 
 
 
 
 
 
 

 

- Wires may be connected in series to generate the required voltage output.  

 - Series wiring  should be configured at the same rate(current) 

 

  

| Parallel Wiring | 

 
 
 
 
 
 
 
 

- Wires may be connected in parallel to generate the required current output.  
- Even when wires are connected in parallel, the intensity of voltage in inverter should   
be considered. 
- Before connected to other modules, all modules should be wired with a fuse. For the 
number of additional fuses and maximum number of module should refer and follow 
the related local regulations. 

        

 

SERIES WIRING [VOLTAGE ADDED] 

PARALLEL WIRING [CURRENT ADDED] 

Summary of Contents for SN245P-10

Page 1: ...INSTALLATION MANUAL INSTALLATION MANUAL PV Module Installation SN Model Version 1 0 2015 INSTALLATION MANUAL...

Page 2: ...and the actual installation use operation and maintenance should be performed by qualified personnel with electrical license 4 For the detailed quality warranty policy of the product please refer the...

Page 3: ...20 year s manufacturing technology and thorough quality management We S Energy Co Ltd will reward our customers by continuing to develop and produce good quality of product and consistently challenge...

Page 4: ...care is required for preventing corrosion contamination deterioration due to mishandling when you load outdoor load installation Store a module in an indoor warehouse before installing Always wear pr...

Page 5: ...ool on the module frame and surface Abrasion of the coated surface may lead to oxidize frames or reduce their strength The scratch of the surface may be the main cause of the module output degradation...

Page 6: ...tall on the vehicle car train etc or ship please request special modules 12 Snow water dust or other foreign substance on the surface may increase reflection of the light and eventually reduce the PV...

Page 7: ...d by S Energy and return it to S Energy for repair and replacement Material All the wire for the PV module connection should be configured with PV cable only Cable for PV double insulation UV resistan...

Page 8: ...on should be designed to satisfy the mechanical load of the site Operating temperature A ambient temperature of module installation site is limited by the minimum and maximum temperature as shown belo...

Page 9: ...the IEC61215 standard and S Energy Co Ltd recommends the following method of installing a frame hole As described in figure 1 an installation hole is inserted in the frame if the frame is randomly pro...

Page 10: ...245 W 250 W 255 W Short Circuit Current Isc 8 85 A 8 86 A 8 93 A Open Circuit Voltage Voc 37 3 V 37 3 V 37 6 V Module Effeciency 15 00 15 30 15 61 Operating module temperature Maximum System Voltage M...

Page 11: ...method is recommended by S Energy for the installation of the PV module on a roof in heavy snow regions Failure to remove accumulated snow on the PV module for long time may cause long term power redu...

Page 12: ...ion and method of clamp installation Module Clamp Assembly 3 Additional Grounding Methods Grounding lug Clamp installation location A position Confirm 7 mechanical installation module drawing Clamp wi...

Page 13: ...orn Germany Tel 49 6196 9540 111 3 Fax 49 6196 9985 778 E mail info europe s energy com SEAI America Inc dba S ENERGY America Address 18881 Von Karman Ave Suite 760 Irvine CA 92612 U S A Tel 1 949 281...

Reviews: