1) Grade[Class A]: The module is a ‘Class A’ grade. 
[Class A: This grade  is regarded as a device operated above  
50V or above 240W and a product where an ordinary person's approach is expected.  
It acquired the safety standard under  IEC 61730-1 and IEC 61730-2] 
 
2) Installation site: The module should be installed at a place satisfying the following  
Respect. 
 

 Safety load 

A 60 series product was designed to tolerate the wind load(the back side)   
of 2400Pa, snow load(the front side) of 5400pa, and a 72 series product was  
designed to tolerate the wind load(the back side) of 2400pa, snow load(the  
front side) of 5400pa. 
When the maximum snowfall and wind load on the site are above the standard,  
a structure to install the module on should be designed to satisfy the mechanical  
load of the site. 
 

 Operating temperature 

 A ambient temperature of module installation site is limited by the  
minimum and maximum temperature as shown below.  
* Maximum operating temperature: +85

[Under the hot temperature,  

ventilation should be considered.] 
* Minimum operating temperature: -40

 

[Considerations when temperature rises: output is reduced due to  
characteristics of the module] 
 

 Places where the installation is prohibited 

 A site directly contacting salt injury 
 A site having poor drainage [Poor drainage can shorten the module life ] 
 A site having a shade caused by the geographic features of the surrounding area.  
 A site where stones and foreign matters are often thrown near to the modules.  
[There are concerns for damage to the front window of the module.) 

7. Mechanical Installation 

POSITION 

60SERIES 

72SERIES 

290 

345 

460 

550 

990 

990 

1650 

1970 

942.5 

942.5 

1425.9 

1589.6 

30 

40 

Summary of Contents for SN245P-10

Page 1: ...INSTALLATION MANUAL INSTALLATION MANUAL PV Module Installation SN Model Version 1 0 2015 INSTALLATION MANUAL...

Page 2: ...and the actual installation use operation and maintenance should be performed by qualified personnel with electrical license 4 For the detailed quality warranty policy of the product please refer the...

Page 3: ...20 year s manufacturing technology and thorough quality management We S Energy Co Ltd will reward our customers by continuing to develop and produce good quality of product and consistently challenge...

Page 4: ...care is required for preventing corrosion contamination deterioration due to mishandling when you load outdoor load installation Store a module in an indoor warehouse before installing Always wear pr...

Page 5: ...ool on the module frame and surface Abrasion of the coated surface may lead to oxidize frames or reduce their strength The scratch of the surface may be the main cause of the module output degradation...

Page 6: ...tall on the vehicle car train etc or ship please request special modules 12 Snow water dust or other foreign substance on the surface may increase reflection of the light and eventually reduce the PV...

Page 7: ...d by S Energy and return it to S Energy for repair and replacement Material All the wire for the PV module connection should be configured with PV cable only Cable for PV double insulation UV resistan...

Page 8: ...on should be designed to satisfy the mechanical load of the site Operating temperature A ambient temperature of module installation site is limited by the minimum and maximum temperature as shown belo...

Page 9: ...the IEC61215 standard and S Energy Co Ltd recommends the following method of installing a frame hole As described in figure 1 an installation hole is inserted in the frame if the frame is randomly pro...

Page 10: ...245 W 250 W 255 W Short Circuit Current Isc 8 85 A 8 86 A 8 93 A Open Circuit Voltage Voc 37 3 V 37 3 V 37 6 V Module Effeciency 15 00 15 30 15 61 Operating module temperature Maximum System Voltage M...

Page 11: ...method is recommended by S Energy for the installation of the PV module on a roof in heavy snow regions Failure to remove accumulated snow on the PV module for long time may cause long term power redu...

Page 12: ...ion and method of clamp installation Module Clamp Assembly 3 Additional Grounding Methods Grounding lug Clamp installation location A position Confirm 7 mechanical installation module drawing Clamp wi...

Page 13: ...orn Germany Tel 49 6196 9540 111 3 Fax 49 6196 9985 778 E mail info europe s energy com SEAI America Inc dba S ENERGY America Address 18881 Von Karman Ave Suite 760 Irvine CA 92612 U S A Tel 1 949 281...

Reviews: