4
3. Instructions for installation and commissioning of the system
General premise
The installation of the debacterization systems of the “LED” series must be carried out by specialized personnel
strictly following the instructions stated below.
The fittings supplied with the MIOLED are suitable for connection under the sink with 3/8” pipes.
MIOLED
includes the following parts:
2X
1X
2X
1X
1X
1X