srsmith.com/au - 5
CONNECTION
Connect the water supply to the connection point at the side of the LM10.
(Images 7 and 8)
Gradually open the supply valve. (Image 9)
Ensure the water supply operating pressure is above 3.5 bars.
Check for any leaks in the water supply network.
TESTING
Carry out several ascents and descents using the control buttons. (Images 10 and 11)
Test the emergency stop valve. (Image 12)
Test the water supply valve. (Image 9)
INSTALLATION
Summary of Contents for LM10
Page 1: ...LM10 POOL LIFT INSTRUCTION MANUAL...
Page 2: ......
Page 12: ...07 3812 2283 srsmith com au...