CANOPY
Install the canopy following these step :
- Canopy edge protection, Adhesive foam tape, Canopy grommets.
(Fig.6)(Fig.7).
The canopy hole must be 12.5 mm in diameter. Initially is 9 mm.
You can enlarge the hole slightly to optimize the vertical position of the canopy itself.
Install the quick release following
Fig 9
. Use special tool inside the bag.
To install the canopy:
- Insert the canopy from the front up to the area of the block shown in
Fig.8
.
- Use the quick release canopy mounts to properly mount the canopy.
It is recommended a bit of lubricant on the quick release canopy mount system.
TAIL BELT TENSION
*Check the proper assembly of the tail boom.
*Check that the aluminum part of the tube is against the M3 stop screw.
*Loosen the tail group by loosening the 4 M3 screws.
*Install the belt onto the pulley, taking care to respect the direction of rotation (
figure 1
).
*Rotate the tail drive several times by hand.
*Load the spring by a rotation of
270°
the tensioning arm (
clockwise
).
*Tension the boom until the tensioning arm is aligned with the frame.
*Tighten the 4 screws.
*Check that the tail output shaft is perpendicular to the tube. (
figure 2
)
*In
figure 3,4,5
you can see the three conditions, ok, too loose and too tight.
NOTE
. To disassemble the tail boom, you can remove the front pulley (H0172-S)
without loosening the tail box. Simply remove the bolt and pull down.
Bag 21
[HA111]
Page 27
Chapter 13,Installation Of the Boom and Canopy