1. Building The Enclosure.
NOTE: If this side burner is to be used as a replacement side burner in an existing enclosure, consult your local contractor
to determine if the side burner will work correctly with your existing enclosure.
Consult the table below for enclosure cut-out dimensions and available mounting locations to secure the side burner to the
enclosure.
Minimum enclosure dimensions are height 34”, width 23” and depth 27”.
NOTE: Area directly beneath the side burner must be open. No solid surface.
Dim. C
Materials included:
Built-In Side Burner Unit
Materials not included:
Enclosure construction materials and fasteners for attachment of side burner to enclosure.
NOTE: ENCLOSURE MUST BE CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS.
INSTALLATION
MODEL
Dim. A
Dim. B
Dim. C
K00SB5317
12.60”
21.40”
9.00”
WARNING
FOR LP GAS CONVERSION:
LP Conversion Kit Model A00AA5517 must be used. Specific details for enclosure construction are included
in the conversion kit instructions.
Ÿ
Additional enclosure venting construction is required.
Ÿ
A tank mounting bracket must be added to enclosure.
Cut Out
Front
Side
Enclosure
Front View
Dim. B
Dim. A
Cut Out
Front
Enclosure
Top View
Rear mounting locations
The front mounting hole locations can be accessed by removing the up-front control panel. This is done by first
removing the control knob and the four mounting screws behind them. This will remove the valve manifold from the
control panel. Next, remove the two screws under the control panel. Pull the control panel out at the bottom and lift
off, revealing the front mounting hole locations. Re-attach the control panel, valve manifold, and control knobs.
The rear mounting hole locations can be accessed from below the sideburner by removing the bottom tray and installing
the mounting screws from under the sideburner when installed.
Front mounting locations
(one each side)
8