Saberz Project
M Chassis Installation Guide
R
ECHARGE
P
ORTS
(RCP
S
)
Version 1.9.5_b
–
September 18, 2022
•
Page 9
Wire the RCP as seen follows:
-
Two
RED
28 AWG wires to the (+) tab (braided together).
-
Use enough wire so one can be later connected to the (+) on the battery sled (which will be directly next to the
ProffieBoard area of the chassis) and the other will be later connected to the BATT (+) pad on the ProffieBoard.
Wire one each of the following:
-
BLACK 22 AWG wire (short wire) later on for (-) on the battery sled.
-
GREEN
22 AWG wire (long wire) later on to the BATT (-) on the ProffieBoard.
Wire orientation: