EN
22
Motor control for CFP-ECM
ON/OFF valve control, power supply 230Vac
Selection of 2 pipe or 4 pipe installation with MC1 jumper
Selection with dip sw n1 , continious ventilation or termostatic control
Management of the air probe, with T-MB or mounted on the fan coil unit
Management of the hot/cold water low temperature cut-out thermostat
Management of the imput circuit
Possibility to create master/slave networks, MAX 20 fan coils
KIT CONNECTIONS
TECHNICAL CHARACTERISTICS
KIT COMPOSITION
NOTE:
Optional T2 change-over
cod.9025310
To use only with 2 pipe fan coil units
and without sinusoidal valve
Connections by the installer:
-Power supply board cable 230 Vac connection
-Signal fan cable 0÷10 Vdc connection
-Valve actuator connection
-T-MB connection
-Modbus cable connection
(optional)
-
MB board for
CFP-ECM
-
T-MB connection board
-
ModBus connection board
-
T1 Ambient probe
-
T3 Water low temperature cut-out
thermostat
- Power supply cable 230 Vac
- Signal cable 0÷10 Vdc
- Plastic protections for accessory connection inlet
- Cable ties