4 - 15
176.12
.A03
Revision 01 Date 14.11.2001
INSTALLATION
4
4.3.5
ELECTRICAL CONNECTIONS
4.3.5.1
Connecting the electrical cables
After the machine has been inspected, the cables are put in place for shipment.
Some cables are removed and placed in a container while others are disconnected from the cabinet and wound up.
The cables are arranged as indicated in the tables and located as illustrated in the diagrams.
A-B
disconnected at one end and wound up
C
completely removed and placed inside a container
T0614
B
C
A
D
D
B
FIGURE 4.3.5.1/A - ARRANGEMENT OF THE CABLES FOR SHIPMENT
Summary of Contents for PMV 224
Page 2: ...TABLE OF CONTENTS 176 12 A03 0 2 Revision 01 Date 14 11 2001 ...
Page 4: ...TABLE OF CONTENTS 176 12 A03 0 4 Revision 01 Date 14 11 2001 ...
Page 34: ...2 22 176 12 A03 Revision 01 Date 14 11 2001 2 MAIN FEATURES ...
Page 42: ...3 8 176 12 A03 Revision 01 Date 14 11 2001 SAFETY EQUIPMENT AND PRECAUTIONS 3 ...
Page 64: ...5 4 5 START UP 176 12 A03 Revision 01 Date 14 11 2001 ...
Page 70: ...6 6 176 12 A03 Revision 01 Date 14 11 2001 6 OPERATING INSTRUCTIONS ...
Page 126: ...8 30 176 12 A03 Revision 01 Date 14 11 2001 8 MAINTENANCE ...
Page 128: ...9 2 176 12 A03 Revision 01 Date 14 11 2001 9 DECOMMISSIONING ...