14
XL-TG10153BM-en-US Rev A · 2013-06-27 · Amendments and Errors Reserved · © SAF-HOLLAND, Inc., SAF-HOLLAND, HOLLAND, SAF,
and logos are trademarks of SAF-HOLLAND S.A., SAF-HOLLAND GmbH, and SAF-HOLLAND, Inc.
Liftgate Installation
Figure 20
Figure 19
ADJUSTING BOLTS
1/4"
MAIN TUBE
1/4"
BOTH
ATTACHING
PLATES
9. Use the platform adjusting bolts to lock the main tube in
position
(Figure 19)
.
10. After the main tube is positioned correctly, prep the vehicle
frame. With a grinder, remove any paint or galvanizing
within 1" to 4" (25-101 mm) of the weld surface.
11. Weld the liftgate attaching plates to the main tube and
to the vehicle frame per
Figure 20
.
NOTE:
When welding is required, ensure that the battery
ground cable is disconnected and that all electrical
equipment is completely electrically isolated
before welding is initiated.
Failure to isolate electrical equipment
from ground prior to welding could result
in overload which, if not avoided, could
result in property damage.
12. Touch up paint as required. For galvanized liftgates, touch
up in accordance with the most recent release of ASTM
A 780: Standard Practice for Repair of Damaged and
Uncoated Areas of Hot Dip Galvanized Coatings, which
specifies the use of zinc-rich paints.
BOTH
ATTACHING
PLATES