18
5, INSTA EL/111ON f1 NI) USE
Before connecting the welding set
to the
rietwork it is essential to check
that Ille voltage required for Ille set duly corresponds (o Ille mains
pollage.
This
operalion being correctly peiformed, the primary supply table of
the sel can be connected 10 a mains power socket or terminal.
Caution :
Never connect the green and
yen() w
conductor (marked hie the
S y M b o l
Ground r L
»)
lu the 'nain terminais ; Ibis is designed (iii accordante
with the standards in force) Io ground the set.
____________
5
1/
Place Ille gas ulinder coi the
eylinder
support
2/ Replace the saletychain
31 Install the pressure reducer
flow-Ineler
6
4/ Connect the gaz pipe
5/
Open the gas
cylinder
61 Set
1he gas flow rate bet1VCCJI
Ill
and
12 1 /min
Connection to the Network
Installation of the Wire
71 !iule Ille mature reel
81 butai' the Coil of win
,
on the coil
support pin
9/ Pull
out about 10 coi of 'vire
101 Close the mobile devis of the
counter-reel.
Setting the gas circuit dito service
3
Summary of Contents for SAFOR MR 160
Page 22: ...IL...
Page 32: ...C O CO 0 O Q O Q Elein i tl 0 lEiSIMMI OCOMMEMI 1 61 C i e n r i l e a l gin egi 22...
Page 33: ...a R 23 F OI 1 1 I Al 2...
Page 36: ......
Page 38: ...371 274 18 19 24 25 16 15 14...
Page 39: ...26...
Page 42: ...2 8...
Page 44: ......