3
Step 1
Step 2
Positioning the SAFARI Montage Live! H.323 Gateway
Install the gateway in a rack mount enclosure, using the supplied mounting brackets
or rails and screws. There should be adequate airflow around the gateway, with
temperatures not exceeding 95ºF.
Unpacking the Hardware
Carefully remove the SAFARI Montage Live! Gateway and the following items from
the box, and place them on a flat surface. If any items are missing, please call
1.800.843.4549.
Power Cord
Keys (2)
(Styles may vary)
Ethernet Cable
Mounting Brackets (2) or
Rails (2) (Mounting Brackets Shown)
Mounting Bracket
Screws (8)
DV Dongle (2)
(VGA and DVI; Styles may vary)