PREPARATION
* Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.
* If any part is missing or damaged, do not attempt to assemble the product.
* Estimated Assembly Time: 6 minutes.
* If you are having difficulty, our friendly Customer Care team is always here to help. Please email customersupport@safavieh.com
NOTE: PLEASE USE ON/OFF TYPE"A"BULB MAX 60-WATT OR CFL BULB MAX 13-WATT OR LED BULB MAX 9-WATT THERE IS 1PC LED 9-WATT BULB IN THE BOX
Step1:
Put the lamp base (C) on the floor.Assemble the big tube(A) and cover(B) and
marble base(C) with (D)and (E) use tool(F).Insert the plastic connector(G
)
into the big
tube(A
)
and tighten with screw(H).
Insert the arc tuber(J
)
into the arc tube(G) and use hexagon wrench(K)to locking
screw(I).Insert the bulb(L)in to the socket.
Step2:
Put the light on a level surface to check if every thing is stable.
2/2