Defender 100LDS™ –
Product Manual Version 1.4
15
Safe Barriers Pte Ltd
Figure 3.1
: Defender 100LDS™ Anchor Layout
3.1.3
Terminal Anchor Layout Requirements
•
All Installations of Defender 100LDS™ Systems require an Approach Terminal.
o
Appendix A: BSI-1707033 AP and D1-TAU-Approach
•
Local Regulations may also require a Departure Terminal.
o
Appendix A: BSI-1707033 AP and D1-TAU-Departure
•
The Approach Terminal and the Departure Terminal each are connected to a specific
Defender Barrier as part of the tested transition. Each of these barriers is to have 4
anchor pins on each side
. Refer Appendix A: BSI-1707033-AP and D7
•
After the Approach Terminal, standard Defender Barrier™ is installed for the rest of
the run until the departure point is reached.
•
Should a departure terminal be required, install as per Drawings referenced in point 2.
Otherwise terminate in a locally approved manner.
•
The minimum installation length between terminals is 78 meters (20 barrier units).
Should it be necessary to install a shorter system due to site conditions contact Safe
Barriers.
3.9 m
TRAFFIC FLOW
ANCHOR
SPACING
1.28 m
9.15 m BETWEEN PINS
CONTINUATION OF STD 3.9m UNITS
1XD7 PIN EACH SIDE
TRAFFIC FLOW
1XD7 PIN EACH SIDE
680
8
0
0
CONNECTION DETAIL-STEP 1
ORIENATE FEMALE END TO MALE END
INSERT THE PIN
F
M
F
M
FEMALE END
MALE END
F
M
SLIDE MALE END ONTO FEMALE
CONNECTION DETAIL-STEP 2
CONNECTION DETAIL-STEP 3
CONNECTION DETAIL-STEP 2
D10 PIN
D
RH
APPROVED
RM
CHECKED
DC
DRAWN BY
DRAWING
REF.
DRAWING
DESCRIPTION
DATE
DIMENSIONS
FINISH
MATERIAL
Tolerances unless otherwise stated
Machining: up to 300mm
±0.50
300 to ~
±0.80
Fabrication: up to 300mm
±2.00
300 to 1000mm
±3.00
1000 to ~
±6.00
Angular: all
±2.0°
APPRD.
DRAWN
DESCRIPTION
DATE
REV
4
3
C
B
A
4
3
2
1
D
C
B
A
1
2
SHEET 1 of 1
WEIGHT
MM
DEFENDER D100LDS SYSTEM
INSTALLATION DETAILS
D100-LDS