Assembly Instructions - Safespace Hi-Lo
2
Position them alongside the pole pockets located in the PVC fabric at each corner.
Fold the fabric diagonally across the Safespace in order to feed the bars into the
bottom pockets. (Not the pockets near mesh).
When the bars are through, position them so the holes are facing outwards away
from the Safespace.
Repeat the process with the top bars.
Identify the
top corner mounting brackets
and align the holes on the horizontal
bars with the holes in the bracket.
Fit the bracket using an
M8 45mm hex head bolt
through the holes from the front of the horizontal bar with an
M8 washer
.
Attach another
M8 washer
and
M8 nyloc
nut
to the threaded end of the bolt on the
inside of the bar.
Repeat for all four corners, doing the one diagonally opposite first.
Tighten all the nuts with a drill nut driver and then finally tighten with a 13 mm
hand spanner.
3
Inserting the Vertical Bars
Working in a pair, one person should lift one side of the Safespace up to roof height
and support it while the second person inserts one of the
vertical bars
over the
threaded bar of one of the corner brackets, placing an
M20 washer
between the 2
parts.
The M20 nuts will have already been added to the top mounting brackets at the
pre-assembly stage.
Lower the Safespace gently onto these poles at this unusual angle temporarily.
Then go to the other side of the Safespace and repeat the same process.
The Safespace is now on all four vertical uprights.