10
Tools:
⇒
Safety Glasses
⇒
Measuring Tape
⇒
Level
⇒
Hammer
⇒
Pipe Cutter
⇒
Hacksaw
⇒
Emery Cloth
⇒
Pencil
⇒
Torch
⇒
Damp Cloths for Cleanup
⇒
Screwdriver to Fit Framing Screws (if used)
Supplies:
⇒
Silicone Caulk
⇒
1 1/2” ABS Pipe
⇒
Required ABS Fittings & Adapters
⇒
ABS Pipe Glue
⇒
Solder & Flux
⇒
1x3 or 1x4 Dimensional Lumber - Approx. 11’ (4.3m)
⇒
2x4 Dimensional Lumber (So-Lo with Shower Deck
Only) - Approx. 5’ (1.5m)
⇒
Screws Or Nails For Framing
⇒
1 1/2” Standard Bathtub Drain
⇒
1 1/2” Standard Bathtub Overflow
⇒
Waterproof Electrical Junction Boxes (2 Required)