background image

safetyplatforms.co.uk | 01924 420820 | info@safetyplatforms.co.uk

INSTALLATION

To install the guardrails, hold them at the mid point whilst standing half way up the stairs. Partially 
insert the lower vertical post in to the socket fi xed near the base of the stairs. Then position the upper 
vertical post in to the socket at the upper end of the stairs.
Repeat this process for guardrails to the opposite side of the stairs.
When guardrails to both sides are positioned tighten the screw fi xing to all four sockets to tighten the 
guardrail frames.

5. Inspection

Prior to use stand back and look at the equipment, ensure it is property erected, Is stable and suit-
able for the task.

6. Edge protection

To comply with the work at Height Regulations and to prevent a risk of falls, ensure the fl oor edges of 
upper fl oors are suitably guardrailed  ;

7. Weekly Inspection

Inspect the stair unit on a weekly basis to ensure the fi xings are secure and for any signs of damage. 
Should there be any issues with fi xings or damage, immediately prevent anyone from using the stairs 
until the fi xings are replaced or damage repaired.

8. Removal

Dismantle the stair unit in the reverse order of the installation and store in a safe and secure manner 
to prevent trips or theft. 

See Items 1 & 3

See Item 4

See Item 2

2437mm

2650mm

to

3050mm

Reviews: