10
Set Up
Air Service
Connect the supply air line to the 1/4” pipe fitting
at the top of the machine. The machine requires
1CFM at 65-100 pounds of compressed air
service. An air nipple is provided at the top of
the machine’s frame. See Fig. 10.
NOTE: If you have any issues with debris or
water from the air service, it is optimum to install
a filter in-line ahead of the service into the
sander.
Dust Collection
Connect an appropriate dust collection system
(1000-1800 CFM) to the machine. The machine
utilizes a 6” dust chute. The dust exits through the
top of the machine. See Fig. 11.
NOTE: Failure to connect the machine to an
appropriate dust collection system may result in
problems with the machine’s operation. These
problems can include false signals from the belt
tracking mechanisms. These problems can also
include premature wear of the machine’s
components.
Air Nipple
Air Supply Line
Figure 10: Air Service
Opening for
External Vac
Connection
Dust Collection
Chute
Figure 11: Dust Collection Chute