Set Up
8
Electrical Service
Requirements
Electrical servicing of the machine must be
completed by an experienced, licensed electrician.
NOTE: Refer to the exploded view and parts list
in the back of the manual for a full view of the
electrical components.
CAUTION: Electrical servicing of
the machine must be completed by an
experienced, licensed electrician.
Single Phase
To connect the unit in a single phase operation,
complete the following steps.
1. Connect 220 volt services to the positions
labels L-1 and L-2 on the main magnetic
starter. See Fig. 4 & 5.
2. Connect the ground wire from the service to
the grounding bar inside the control panel. See
Fig. 6.
Connect the neutral wire from the service to the
wire labeled “neutral.” See Fig. 6.
NOTE: If there is not a neutral wire in the
incoming service, then connect the small
neutral wire from the machine to the grounding
bar. This may already be connected from the
factory but should be double checked by your
electrician as part of the wiring procedure.
L-1
L-2
Ground
Wire
Neutral
Wire
Pig Tail
Neutral
L-3
Figure 4: Electrical Connections
Grounding
Bar
Neutral
Wires
Magnetic
Starter
L-2
L-1
Figure 5: Electrical Schematic
Figure 6: Starter