LIFT MODEL VISION AS 300 Rev001
11-1
11
TRANSPORT
The transportation of the machine from one site to another can be effected using a proportioned
in dimensions truck.
The motor unit, forks and
cabin
can be supplied all together or separately, in case of problems
with the dimensions during transport and erection. The assembly of the parts will be carried out
at site at
the time of installation. Even the cabin -either to allow the assembly inside the hoist
way to be loaded and transported in a container- can be supplied demounted
The elevator transport can be done only after the dismantling of the hoist according to the
prescriptions contained in chapter “
ERECTION AND DISMANLING
”
Procedures for transport
Load the vertical elements first. Then the
cabin
, the fence and last, the base. All the material
must be arranged with accuracy and adequately fastened in order to avoid useless risks during
transport.
The whole operation must be effected in compliance with the rule of road of the relevant
Country.
The Company who will use the elevator must appoint a person in charge of it, who must know
this manual in all its parts. The person in charge of the elevator must also supervise all the
operations of elevator management made by authorized personnel.
Before starting to work make sure that all the safety systems are in working order and in good
conditions, that all the bolts, pin jacks, screws and anchor screws fit their housing and are well
fastened. Check the braking system of the motor unit working order.
Summary of Contents for VISION AS 300
Page 2: ......
Page 4: ......
Page 43: ...LIFT MODEL VISION AS 300 Rev001 7 4 Fig 7 1 Dimension...
Page 68: ...LIFT MODEL VISION AS 300 Rev001 12 1 12 WIRING DIAGRAMS Fig 12 1 Wiring diagram Power supply...
Page 69: ...LIFT MODEL VISION AS 300 Rev001 12 1 Fig 12 2 Wiring diagram Motor power supply...
Page 70: ...LIFT MODEL VISION AS 300 Rev001 12 2 Fig 12 3 Wiring diagram Emergency circuit...
Page 71: ...LIFT MODEL VISION AS 300 Rev001 12 3 Fig 12 4 Wiring diagram Auxiliary...
Page 72: ...LIFT MODEL VISION AS 300 Rev001 12 4 Fig 12 5 4 Wiring diagram Auxiliary PLC logo expans...
Page 73: ...LIFT MODEL VISION AS 300 Rev001 12 5 Fig 12 6 Auxiliary circuit...
Page 74: ...LIFT MODEL VISION AS 300 Rev001 12 6 Fig 12 7 Wiring diagram Connectors C1 C2 C3...
Page 75: ...LIFT MODEL VISION AS 300 Rev001 12 7 Fig 12 8 Wiring diagram Terminal box electric panel...
Page 76: ...LIFT MODEL VISION AS 300 Rev001 12 8 Fig 12 9 Wiring diagram Cable call floor...
Page 77: ...LIFT MODEL VISION AS 300 Rev001 12 9 Fig 12 10 Wiring diagram Floors call connection...
Page 78: ...LIFT MODEL VISION AS 300 Rev001 12 10 Fig 12 11 Wiring diagram Box floor call connection...
Page 79: ...LIFT MODEL VISION AS 300 Rev001 12 11 Fig 12 12 Wiring diagram Box Fencing connection...
Page 80: ...LIFT MODEL VISION AS 300 Rev001 12 12 Fig 12 13 Wiring diagram Cable fancing call...
Page 81: ...LIFT MODEL VISION AS 300 Rev001 12 13 Fig 12 14 Main electrical box components...
Page 82: ...LIFT MODEL VISION AS 300 Rev001 12 14 Fig 12 15 Material list 1...
Page 83: ...LIFT MODEL VISION AS 300 Rev001 12 15 Fig 12 16 Material list 2...