6-24
Maintenance
Date en cours : 23 avril 2003
\\Sct31nt3\BE31-DOC\DOC 31 - En cours\Travaux en cours\MFL-MFC-MFK\MFL_251 270 819 A_LASER PRO 341
GB_EXPORT\Maintenance Gb.fm
+
4 - Put the machine in the plastic bag and then in the original package, with all the original
packing material
+
Put all the documentation (User’s Manual and printed documents) in the shipping box
+
Close the shipping box with adhesive tape
MFL_251 270 819 A_LASER PRO 341 GB.book Page 24 Mercredi, 23. avril 2003 2:55 14