Power up
98-136280-B
Chapter 5: Connecting power
5-5
5555
Connecting power
5.4
Power up
1. Connect power to SAILOR Transmodulator or multi switch (if installed).
2. Switch on the ACU. The unit starts up and goes through an initialization procedure:
• ACU POST
• ADU Initializing
• ADU POST
• READY
This may take some time (up to a couple of minutes).
3. The SAILOR 100 Satellite TV is ready to be calibrated (for first time power up). The
ACU display shows the following message:
The LEDs
Power
and
Fail/Pass
are
steady green
, the TV Ready is off. For further
information on status indicators see
Status signalling with LEDs and status
Make sure there are no hardware failures or error codes present, check the display
of the ACU for events. For more information on error codes and events see
4. Continue to get the SAILOR 100 Satellite TV system operational, do the following:
• Make an azimuth calibration.
• Configure the SAILOR Transmodulator (if installed).
• Create one or more satellite profiles.
For step-by-step instructions, see
Introduction to the configuration tools
For installation check lists see,
Figure 5-3: ACU display after first power on (example with LAN port 1 used)
Steady
green
SAILOR100IM.book Page 5 Friday, January 18, 2013 10:28 AM
Summary of Contents for 100
Page 1: ...INSTALLATION MANUAL SAILOR 100 Satellite TV ...
Page 2: ......
Page 8: ...vi 98 136280 B SAILOR100IM book Page vi Friday January 18 2013 10 28 AM ...
Page 141: ...Appendices SAILOR100IM book Page 1 Friday January 18 2013 10 28 AM ...
Page 142: ...SAILOR100IM book Page 2 Friday January 18 2013 10 28 AM ...
Page 178: ...Glossary Glossary 4 98 136280 B SAILOR100IM book Page 4 Friday January 18 2013 10 28 AM ...
Page 185: ......