VERS. 04.12.2019
MAN CWM 216/254 EN
11
Operating position (fig A)
1. Push the operating handle (1) (step 1) downwards and disengage the locking bolt (24) from its locking position (step
2).
2. Lift the operating handle (1) to its full height (step 3).
Work piece Clamp (fig B)
The work piece clamp (11) is pre-assembled. Insert the height adjustment pillar (11b) into the work piece
clamp holder (38) on either side of the base if necessary.
Fence (fig C)
Install:
1. Unlock the fence locking lever (37) (step 1).
2. Align the fence gaps (13a) with the screws (37a). Insert the fence (13) into the slot (step 2).
3. Slide the fence to the desired position (step 3).
4. Lock the fence locking lever (37) (step 4).
Uninstall:
1. Unlock the fence locking lever (37).
2. Slide the fence (13) to the end of the slot and remove it from the slot.