Levelling supports are provided as the accessories, the
screws are included.
3
4
After hanging or setting a heat recovery unit (1), it is necessary to connect condensate discharge system (2-3). A pipe (3) (metal or plastic pipes are
connected using an elbow G3/8, if the device is placed on the legs; rubber pipes are connected using a strap, in other cases condensate pipe can be
extended in any direction) should be connected following this course: heat recovery unit (1), pipe (3) and sewerage system. The pipe (3) must have an
incline of not less than 3° (1 meter of a pipe shall be inclined down by 60 mm)! Before turning on the heat recovery unit (1), it is necessary to pour 0,5
l of water (or more) (pipe loop (3) should always be full) and to make sure, that water gets to the sewerage system! Otherwise, while the heat recovery
unit (1) is operating, water can get into the premises!
Condensate discharge system should be used in premises, where the ambient temperature must not be lower than 1° C! If it falls below 0°C, system
must be protected using thermal insulation!
It is not necessary to install the loop (3) of the pipe under the heat recovery unit (1), but it must be lower than the level of heat recovery unit (1).
1,0
o
Possible positions for condensation measurement:
D = min 150 mm
1
2
3
3
a