and noise level, you can increase the diameter.
• In order to reduce the level of the noise in the air supply system, install dampers (see chapter on their installation).
• In order to reduce air loss in the system, the air ducts and profile parts should be of class C and higher. Their catalog can be found in our website.
• Outside air and exhaust system piping should be isolated in order to prevent heat loss and condensation.
• It is recommended to maintain a distance of up to 8 meters between air intake and air exhaust ducts. Air supplying system should be installed
further from potential air pollution sources.
• Use holders while installing air ducts next to the ventilation equipment. They suppress vibration and assure a firm installation of various system
parts. Necessary holders can be found in our catalog or website.
• A common mistake is that air ducts are connected in inappropriate place. On the ventilation equipment there are signs, indicating the air duct to
be connected. Before starting the system carefully check whether the work was performed properly.
Right side connection
Left side connection
5.11. CONNECTION OF THE UNIT TO ELECTRIC NETWORK
• Supply voltage to the unit must be connected by a qualified specialist following the manufacturer’s instructions and effective safety instructions.
• The unit’s power network voltage must correspond to electrotechnical parameters of the unit indicated in the technical decal.
• The unit’s voltage, power and other technical parameters are provided in the unit’s technical decal (on the unit casing). The unit must be connect-
ed to the voltage plug socket of the grounded power network in compliance with the effective requirements.
• The unit must be earthed according to the rules on installing electrical equipment.
• It is prohibited to use extension wires (cables) and power network plug socket distribution devices.
• Prior to carrying out any ventilation unit installation and connection activities (until its hand-over to the customer), the unit must be disconnected
from the power network.
• After installation of the ventilation unit, the power network plug socket must be accessible at any time and disconnection from the power network
is performed through the two-pole circuit breaker (by disconnecting phase pole and neutral).
• The unit must be thoroughly checked against damages (execution, control, measurement nodes) during transportation before it is connected to
the power network.
• The power cable can be replaced only by a qualified specialist upon the evaluation of the rated power and current.
The manufacturer does not assume any liability for personal injuries and property damage due to nonconformance with the
provided instructions.
5.12. START-UP RECOMMENDATIONS
5.12.1. SYSTEM PROTECTION
The control automatics of the unit have integrated protection against a short circuit of those assemblies. The controllers have the following pro-
tectors:
MCB
F1, F2 - 1A(5x20) MCB protection;
To ensure safe maintenance of the unit, it is necessary to turn off main switch and/or external protection device.
5.12.2. PRE-STARTUP RECOMENDATIONS OF THE UNIT (IN THE PRESENCE OF THE ENDUSER)
Prior to start-up the system must be thoroughly cleaned. Check whether:
• operation systems and unit elements as well as automation and automation devices were not damaged during installation,
•
all electrical devices are connected to power supply and fit for service,
• all necessary automation elements are installed and connected to power supply and MCB, EX1, EX2 terminal blocks,
• cable connection to MCB, EX1, EX2 terminal blocks comply with the existing power connection diagrams,
• all electrical equipment protection elements are properly connected (if they are additionally used),
• cables and wires correspond to all applicable safety and functional requirements, diameters, etc.,
• earthing and protection systems are properly installed,
• condition of all seals and sealing surfaces is correct.
Summary of Contents for SMARTY XV Series
Page 1: ...SMARTY XV EN MOUNTING AND INSTALLATION INSTRUCTION...
Page 23: ...EN 23 SMARTY XV v2020 2 EKA NIS connection...
Page 30: ...30 EN SMARTY XV v2020 2 Figure 8 1 9 2 Smarty 2XV 1 1 Smarty 2XV 3XV 4XV 1 2 219 1017 0 1 2 PS...
Page 49: ...49 SMARTY XV v2020 2...
Page 50: ...50 SMARTY XV v2020 2...
Page 51: ...51 SMARTY XV v2020 2...