7.
Restart the entire system to fully charge the ACD battery pack.
8.
Disconnect the panels and use the system's loads to discharge
the entire ACD battery pack (the inverter's "On-Grid DOD"
screen should still be set at 95%; as described in point 4).
9.
Shut down the entire solar installation and reinstall the B bat-
tery module in the ABCD battery pack.
10.
Restart the entire system to fully charge the ABCD battery
pack.
11.
Disconnect the panels and use the system's loads to discharge
the entire ABCD battery pack (the inverter's "On-Grid DOD"
screen should still be set at 95%; as described in point 4).
12.
Connect the panels and reset the value of the inverter's
On-Grid DOD screen to its original value from before starting
the whole procedure.
NOTE: Installing a new battery module can take several
days, with all the charging and discharging processes,
depending on the available load on the system.
EQX2
SOLAR INVERTERS CONNECTED TO THE GRID
USER MANUAL
Summary of Contents for EQUINOX BATT EQX2 BATT
Page 1: ...EQX2 BATT ES EN MANUAL DE USUARIO BATER AS MODULARES PARA INVERSORES SOLARES...
Page 2: ...2 SALICRU...
Page 19: ...19 ES EQX2 INVERSORES SOLARES DE CONEXI N A RED MANUAL DE USUARIO...
Page 21: ...EQX2BATT EN USER MANUAL MODULAR BATTERIES FOR SOLAR INVERTERS...
Page 22: ...22 SALICRU...
Page 39: ...39 EN EQX2 SOLAR INVERTERS CONNECTED TO THE GRID USER MANUAL...