- 38 -
Fig. 2.9 - Conexión provisional para facilitar la recarga de baterías
Temporary connection to enable battery recharge
1
2 3 4 5 6 7 8
11 12 13 14
15
r
ed 360÷415 Vca/50 Hz - 3F+N+PE (GND)
mains 360÷415 Vac/50 Hz 3PH+N+PE (GND)
Sección-
Section: 6 mm
2
PE
PE
PE
PE
PE (tierra -
gnd)
PE
PE
PE
PE
PE (ground – gnd)
U1
V1
N1
(A)
(B)
W1
Bornera del SAI
UPS TAGBLOCK
1 = Entrada red fase U1(L11)/
Output phase U2(L11)
2 = Entrada red fase V1(L21)/
Output phase V2(L21)
3 = Entrada red fase W1(L31)/
Output phase W2(L31)
4 = Entrada neutro/
Output neutral
5 = Entrada bypass U3(L13)/
Input reserve U3(L13)
6 = Entrada bypass V3(L23)/Input reserve V3(L23)
7 = Entrada bypass W3(L33)/
Input reserve W3(L33)
8 = Entrada neutro/
Output neutral
9 = Negativo bat./
Battery negative
10 = Positivo bat./
Battery positive
11 = Salida fase U2(L12)/
Output phase U2(L12)
12 = Salida fase V2(L22)/
Output phase V2(L22)
13 = Salida fase W2(L32)/
Output phase W2(L32)
14 = Salida neutro/
Output neutral
15 = Masa GND/
Ground GND
9 10
(L11)
(L21)
(L31)