background image

42

7. Maintenance, 

warranty 

and service.

7.1. Battery 

maintenance.

Ŗ

Pay attention to the safety instructions regarding battery and 
the stated in section 1.2.3.3.

Ŗ

The UPSs from 

SLC TWIN RT

  series  only  requires  a 

minimum maintenance. The used battery in the standard 
models is lead acid, sealed, VRLA and maintenance free. 
These models require a minimum of reparations. The only 
requirement is to charge the UPS regularly, in order to pro-
long the battery lifetime. Meanwhile, it is connected to the 
power  supply,  never  mind  if  the  UPS  is  ON  or  OFF,  it  will 
keep the batteries charged and will give protection against 
overcharging and undercharging.

Ŗ

The UPS has to be charged once, every 4 or 6 months if it 
has not been used for long time.

Ŗ

In hot areas, battery has to be charged every 2 months. The 
charging time has to be 12 hours as minimum.

Ŗ

Under normal conditions, the battery lifetime is from 3 to 5 
years 25º C. In case that the battery was not in good condi-
tions, it has to be replaced before. This replacement has to 
be done by qualified staff.

Ŗ

Always replace them with the same quantity and type.

Ŗ

Do not replace one battery only. All batteries have to be re-
placed at the same time and following the instructions of the 
manufacturer.

Ŗ

Usually, the batteries should be charged and discharged 
every 4 or 6 months. The charging would be started after a 
UPS shutdown due to a low battery (discharging). Charging 
time for standard UPS should be 12 hours as minimum.

7.1.1.  Notes for installing and replacing 

the batteries. 

Ŗ

If it is needed to replace the connection of any wire, purchase 
original parts through authorised distributors or service cen-
tres in order to avoid overheating and sparks with fire risk 
because the size is not enough.

Ŗ

Do not short the + and - poles of the batteries, there is risk of 
fire or electrocution.

Ŗ

Be sure that there is no voltage before touching the batteries. 
Battery circuit is not isolated from the input. Hazardous volt-
ages can be found between the battery and earth terminals.

Ŗ

Although the input and bypass circuit breaker switches (the 
last one in 4 to 10kVA models with the respective power 
supply mains) are turned off, the internal parts of the UPS 
are still connected to the batteries, so there are hazardous 
voltages inside.
Therefore, before doing any reparation or maintenance task, 
the internal battery fuses have to be removed and/or the in-
terlink connections between them and the UPS.

Ŗ

Batteries have hazardous voltages. The battery maintenance 
and replacement have to be done by qualified personnel and 
familiarised with them. Nobody else can manipulate them.

7.2.  UPS Trouble Shooting guide.

If the UPS doesn't work properly, check the information given 
by the LCD of the control panel, according to the models and 
power of the equipment. Try to solve the problem by means of 
the established steps in the tables 9 and 10. In case the problem 
persists, consult with our Service and Technical Support S.T.S..

When it is needed to contact with our Service and Technical Sup-
port S.T.S. , provide the following information:

Ŗ

UPS model and serial number.

Ŗ

Date when the problem occurred.

Ŗ

Complete description of the problem, including the infor-
mation given by the led or LCD panel and the status of the 
alarms.

Ŗ

Power supply condition, type of load and the level connected 
to the UPS, ambient temperature, cooling conditions.

Ŗ

Information of the batteries (capacity and battery quantity), if 
the equipment is (B0) or (B1) -with external batteries-.

Ŗ

Other informations that you may think that they are important.

USER MANUAL

Summary of Contents for SLC TWIN RT series

Page 1: ...LIGHTING FLOW DIMMER STABILIZERS ILUEST SWITCH MODE POWER SUPPLY STATIC INVERTERS PHOTOVOLTAIC INVERTERS VOLTAGE STABILIZERS AND POWER LINE CONDITIONERS UPS SLC TWIN RT series 0 7 to 10 kVA UNINTERRUP...

Page 2: ......

Page 3: ...3 8 Dry_out terminals dry contact for alarm 0 7 to 3 kVA equipments only 4 3 9 Connection in parallel 4 3 9 1 Introduction to the redundancy 4 3 9 2 Installation and parallel operating 4 to 10 kVA eq...

Page 4: ...respect such instructions can damage the goods Precaution symbol Read the paragraph text and take the stated preventive mediums it contents the basic instructions and features for the equipment safety...

Page 5: ...circuit that supplies the equipment Cross cable section and its features will be same as the power supply cables but with green colour with or without the yellow strip All outlets of the UPS has an ea...

Page 6: ...shutdown it immediately and disconnect it from the power supply This kind of fault can cause fire or electrical dis charge Contact with our S T S In case of an accidental equipment dropping or if the...

Page 7: ...rds to quantity capacity and voltage are stated in this battery label sticked beside the nameplate of the equipment Respect these data battery connection polarity and the supplied circuit diagram stri...

Page 8: ...ive EMC In accordance with the specifications of the harmonized stand ards Standards as reference EN IEC 62040 1 Uninterruptible power supply UPS Part 1 1 General and safety requirements for UPS s use...

Page 9: ...RT models from 4 to 10 kVA Battery module for TWIN RT from 0 7 to 3 kVA Battery module for TWIN RT from 4 to 10 kVA Fixing screws Front plastic trim Fixing screws Front plastic trim Fixing screws Fro...

Page 10: ...r Fan IEC AC outlets LS1 Models of 2 kVA B1 USB COM port RS232 COM port IEC inlet for AC power supply Main earth for battery module Connector for remote ON OFF Auxiliary contact connector Connector fo...

Page 11: ...odule Battery module for equipments from 0 7 to 3 kVA Earth bonding temrinal to be connected to the equipment and with other module Battery module for equipments from4 to 6 kVA The connection of the b...

Page 12: ...the UPS case or cabinet Under request it is possible to supply the acces sories screws and electrical cables needed to install and connect the external batteries B1 Equipment with extra battery charg...

Page 13: ...ssible to increase the standard back up time of the equip ment by connecting additional battery modules In order to optimise the recharging time of the batteries there are equipments that in corporate...

Page 14: ...ce between this option and the manual bypass in tegrated in the own UPS enclosure in models of higher power rate than 3 kVA consists in a better manoeuvring because it allows a complete disconnection...

Page 15: ...ze they will be as minimum to the currents stated in the nameplate of each UPS In the nameplate of the equipment there are only printed the nominal currents as it is stated in the safety standard EN I...

Page 16: ...where the ambient temperature exceeds above 50 C or below 15 C otherwise it may de grade the electrical characteristics of the batteries 4 2 3 Unpacking The packaging of the equipment consists of a c...

Page 17: ...or battery pack Handle for battery pack rack Fig 4 Battery pack s removing 4 2 5 Vertical tower type or rack models All the UPSs from SLC TWIN RT series are designed to as semble the equipment as towe...

Page 18: ...he beautiful front cover proceed as follows see figure 6 Take out the control panel A see section 4 2 5 1 and remove the fixing screw B of the beautiful front door lo cated below the first one and put...

Page 19: ...supports or stabilizers C to hold the equipment and battery module For equipments up to 3 kVA Put the UPS and battery module on vertical position be tween the stabilizers supports C Fix the D metalli...

Page 20: ...of each front cover there are the K trims as hole to go the cables through it with the battery modules Break the needed trims to pass the connection bus Put the beautiful front cover back of the equi...

Page 21: ...lied screws Put a UPS in a rack cabinet it is needed to have the side internal as support mode C In lack of them and under request a universal rails can be supplied as a guide to be installed by the e...

Page 22: ...is recommended to use terminals in all the cable ends which are connected to the power blocks specially in the power ones input output and bypass Check the correct torque in the screws of the power b...

Page 23: ...r and fuse for general purpose of 250V AC 3A type F 3 Two poles contactor of 230V AC with a minimum distance between contact of 1 4 mm and coil of the same voltage with the minimum current stated in t...

Page 24: ...the load connected to the respective outlet has to be checked otherwise the protection will be acti vated and deactivated cyclically and therefore the loads will suffer the consequences For hardwired...

Page 25: ...dule 4 3 5 Connection of main input earth terminal and the earth bonding terminal As this is a device with class I protection against elec tric shocks it is essential to install a protective earth con...

Page 26: ...arate from other lines that have dangerous voltages energy distribution line Parallel connection bus Use the bundle with 25 signal cables with mesh and DB25 connectors in the ends to joint up to 2 equ...

Page 27: ...Output 3 RXD Input 5 GND Input Tabla 5 Pin out of the RS232 in the DB9 connector USB communication port is compatible with the USB 1 1 pro tocol for communication software 4 3 10 2 Smart slot UPSs hav...

Page 28: ...management This software supplies an auto Shutdown for a system based on several PCs in case of an electrical blackout With this soft ware the end users can monitor and manage any UPS in the same IT...

Page 29: ...e ones are required to be connected like laser printers or CRT monitors keep in mind the start inrush currents of these peripherals in order to avoid that the equipment becomes blocked under the worst...

Page 30: ...re than 3 seconds to shutdown the inverter The acoustic alarm will beep for 3 sec The equipment will be established on Bypass mode When finishing the previous action there is still voltage at the UPS...

Page 31: ...ker switch of the distribution panel corresponding to the new integrated equipment The complete parallel system will supply output voltage through the bypass Remove the cover of the manual bypass in e...

Page 32: ...wrong manoeuvring the mechanical lock has to be fit otherwise the equipment and loads are exposed to serious damages even the de struction of both or fire Move the manual bypass switch to position UP...

Page 33: ...lowing parts Four buttons or membrane keys see table 7 A LCD panel with two colours backlight By default the text or graphics messages are shown in white colour over blue background When a critical al...

Page 34: ...in the LCD and there has not been any manipulation over the buttons it will return back to main screen automatically The main screen shows the following information by default Summary of the status in...

Page 35: ...ads so the ECO mode operating has to be consid ered according to this issue Fig 26 ECO mode screen Frequency converter mode Fig 27 Frequency converter mode screen In the frequency converter mode the s...

Page 36: ...about the current conditions of the equipment details of measures event data logger the own identification of the UPS and change the set tings to be adapted to the own needs and optimise the func tion...

Page 37: ...een by default Alarm screen Parallel system screen Screen Press 1 sec Press o 1 sec Structure of the menu UPS status Main menu structure Press 1 sec Fig 34 UPS status screens 6 3 2 UPS status submenu...

Page 38: ...ey The system is cyclic so you can move in both directions The maximum quantity of registers of the data logger is 50 so a new input will delete the oldest register When pressing the key for more than...

Page 39: ...ble by password by the S T S Control submenu for 0 7 to 3 kVA models Press 1 sec Press o 1 sec Control submenu structure Main menu structure Press 1 sec Press 1 sec Press 1 sec Accesible with password...

Page 40: ...ted or deactivated from this menu Any new alarm will activate the own acoustic alarm Battery test It is a control command of the UPS to make a battery test of the equipment It is also possible to do i...

Page 41: ...ms approximately Therefore this function is not suitable for some sensitive loads or areas with unstable power supply 6 4 1 2 To establish the ECO mode function The function can be activated or deacti...

Page 42: ...heating and sparks with fire risk because the size is not enough Do not short the and poles of the batteries there is risk of fire or electrocution Be sure that there is no voltage before touching the...

Page 43: ...ipment is too high Check the UPS cooling and ambient temperature of the room 93 Back Feed s lo en modelos 3 kVA On battery mode bypass has voltage Transfer to manual bypass and consult with the S S T...

Page 44: ...ooting guide Warning indications 7 2 3 Troubleshooting guide Other circumstances Circumstance or condition Possible cause Solution Code Description in the LCD panel 01 Bypass Abnormal Bypass power sup...

Page 45: ...several tests and sets in the systems Measurement and write down input currents and voltages among the phases Measurement and write down output currents and voltages among the phases Measurement and...

Page 46: ...62040 3 non linear load Transient recover time of the output voltage with load step 0 100 0 9 Transient recover time of output voltage with load step 20 100 20 6 Frequency With mains present synchroni...

Page 47: ...s connectors 6 IEC 10A 3 x LS1 3 x LS2 1 IEC 16 A 3 kVA UPS only 4 IEC 10A 2 IEC 16 A 8 IEC 16 A Output terminals 3 Phase neutral and PE Communication ports 2 RS232 DB9 and USB mutually exclusive Moni...

Page 48: ...ms toward others kVA The voltampere is the unit of the apparent power in electrical current In direct current is almost equal to the real power but in alternating current can defer depending on the po...

Page 49: ...49 SALICRU...

Page 50: ...50 USER MANUAL...

Page 51: ...51 SALICRU...

Page 52: ...NCIA VALLADOLID ZARAGOZA BRANCHES AND SERVICES AND TECHNICAL SUPPORT S T S CHINA FRANCIA HUNGR A MARRUECOS M XICO PORTUGAL REINO UNIDO SINGAPUR SUBSIDIARIES ALEMANIA ARABIA SAUD ARGELIA ARGENTINA B LG...

Reviews: