1
Pegasus Floor Scale Installation Guide
Pegasus Floor Scale Installation Guide
For Shear Beam, Mild and Stainless Steel Scales and Poly Top Floor Scales
Proper scale installation provides accurate and reliable system operation. It is
essential to mount the scale on a flat, level, and solid surface. The load-
bearing surface areas should be within ±1/16 inch of the same level plane.
Minor irregularities in the floor may be compensated for with the feet adjust-
ments. The scale should not rock on the load-bearing surface areas and
these areas should not give under loads.
Figure 1
Pegasus scales
This scale is precalibrated and is ready for installation and use.
• Place the Pegasus deck on a solid, level surface. Use the leveling feet
to eliminate any rocking of the deck.
• Mount the indicator using the bracket provided. This will accommodate
desk or wall mounting.
• Uncoil the cable from under the scale and route it to the indicator. The
cable should be protected from traffic to avoid damage. Connect the
cable to the indicator. See note at left.
• Apply power to the indicator and verify proper scale performance.
Installation
Washdown systems will need to
have the cable connected to
the junction box. Use the
indicator manual to insure
proper wiring.