background image

F

Installation guide

Guide d'installation

Guía de instalación

Eng

E

 N x B2 1x.. series

B2

B2

1

2

3

6

Push!

+

-

-

+

click!

7

4

All contents current at time of publication. SALTO Systems S.L. reserves the right to change
availability of any item in this catalog, its design, construction, and/or materials.

AT THIS POINT DO NOT

CLOSE THE DOOR

PROGRAM THE CYLINDER FIRST

EN ESTE PUNTO NO CIERRE LA

PUERTA, PROGRAME PRIMERO EL

CILINDRO

Eng

E

NE FERMEZ PAS LA PORTE.

PROGRAMEZ LE CYLINDRE AVANT

F

      Installation

Installation            Instalación

Eng

F

E

SP225542

Not included/

Nicht enthalten/

Non inclus/

No incluido

Niet inbegrepen/

Non incluso/

Não incluso

+

PH2

i

225783-ED.- 24/06/2020

1/2

SALTO Neo RIM for SCHALGE

B-Series Deadbolt *

© 2020 SALTO Systems S.L.

®

5

8

1/2

1

2

3

      Battery change             Remplacer les piles             Cambio de pilas

Eng

F

E

DRY!

SEC!

SECO!

1.1

1.2

* All other references to other registered trademarks belong to their respective
owners . /

* Toutes les références à d'autres marques ou marques déposées

appartiennent à leurs propriétaires respectifs. /

*Todas las  referencias a otras

marcas comerciales o registradas pertenecen a sus respectivos propietarios.

G1824

G1824

IP66

OUTDOOR Use!

INDOOR Use!

a

b

SALTO Recommended

Batteries SP01926-5

                 Danger for electronic components

                 due to electrostatic discharge.

www.saltosystems.com/en/quick-links/manuals-and-guides/

i

Reviews: