F
Installation guide
Guide d'installation
Guía de instalación
Eng
E
N x B2 1x.. series
B2
B2
1
2
3
6
Push!
+
-
-
+
click!
7
4
All contents current at time of publication. SALTO Systems S.L. reserves the right to change
availability of any item in this catalog, its design, construction, and/or materials.
AT THIS POINT DO NOT
CLOSE THE DOOR
PROGRAM THE CYLINDER FIRST
EN ESTE PUNTO NO CIERRE LA
PUERTA, PROGRAME PRIMERO EL
CILINDRO
Eng
E
NE FERMEZ PAS LA PORTE.
PROGRAMEZ LE CYLINDRE AVANT
F
Installation
Installation Instalación
Eng
F
E
SP225542
Not included/
Nicht enthalten/
Non inclus/
No incluido
Niet inbegrepen/
Non incluso/
Não incluso
+
PH2
i
225783-ED.- 24/06/2020
1/2
SALTO Neo RIM for SCHALGE
B-Series Deadbolt *
© 2020 SALTO Systems S.L.
®
5
8
1/2
1
2
3
Battery change Remplacer les piles Cambio de pilas
Eng
F
E
DRY!
SEC!
SECO!
1.1
1.2
* All other references to other registered trademarks belong to their respective
owners . /
* Toutes les références à d'autres marques ou marques déposées
appartiennent à leurs propriétaires respectifs. /
*Todas las referencias a otras
marcas comerciales o registradas pertenecen a sus respectivos propietarios.
G1824
G1824
IP66
OUTDOOR Use!
INDOOR Use!
a
b
SALTO Recommended
Batteries SP01926-5
Danger for electronic components
due to electrostatic discharge.
www.saltosystems.com/en/quick-links/manuals-and-guides/
i