background image

W TABLES

designed by David Lopez Quincoces

Via Aurelia 395/E, 55047, Querceta (LU), Italy  salvatori.it  info@salvatori.it  +39 0584 769 200

=

Installazione / 

Installation

1.  Regolare i piedini di appoggio della base 

in modo che, una volta appoggiato il 
piano in pietra, questo risulti in bolla. 

Regulate the adjustable supports at

the base of the legs to ensure that the
structure is perfectly level.

Nota! / 

Note!

Attenzione, durante la movimentazione del prodotto, onde evitare di danneggiare la
pietra, si consiglia di appoggiare sempre i diversi elementi su una super

ficie 

protettiva.

Take care when handling this product to avoid damaging the stone, particularly the
edges. We recommend placing it on a protective surface such as cardboard or a
sheet. Ideally installation should be carried out by two people.

2. Appoggiare il piano del tavolo sulle 

gambe in metallo. / 

Place the top on the

metal legs.

LxPxH - 240x120x72 cm

LxDxh - 94.5x47.2x28.4 in

LxPxH - 300x150x72 cm

LxDxh - 118.1x59.1x28.4 in

Nota! / 

Note!

Si consiglia di far eseguire l’installazione a personale qua

lific

ato.

Installation should only be carried out by 

qualifie

d tradespeople.

Nota! / 

Note!

Fare attenzione al peso del piano in pietra.

Remember that the stone top weighs a 

signific

ant amount.

Nota! /

 Note! 

Si consiglia di far eseguire l’installazione a personale qualificato.

Installation should only be carried out by 

qualifie

d tradespeople

Installazione / 

Installation

1.  Regolare i piedini di appoggio della base 

in modo che, una volta appoggiato il 
piano in pietra, questo risulti in bolla. 

Regulate the adjustable supports at

the base of the legs to ensure that the
structure is perfectly level.

Nota! / 

Note!

Attenzione, durante la movimentazione del prodotto, onde evitare di danneggiare la
pietra, si consiglia di appoggiare sempre i diversi elementi su una super

ficie 

protettiva.

Take care when handling this product to avoid damaging the stone, particularly the
edges. We recommend placing it on a protective surface such as cardboard or a
sheet. Ideally installation should be carried out by two people.

2. Appoggiare il piano del tavolo sulle 

gambe in metallo. / 

Place the top on the

metal legs.

LxPxH - 240x120x72 cm

LxDxh - 94.5x47.2x28.4 in

LxPxH - 300x150x72 cm

LxDxh - 118.1x59.1x28.4 in

Nota! / 

Note!

Si consiglia di far eseguire l’installazione a personale qua

lific

ato.

Installation should only be carried out by 

qualifie

d tradespeople.

Nota! / 

Note!

Fare attenzione al peso del piano in pietra.

Remember that the stone top weighs a 

signific

ant amount.

Nota! / 

Note! 

Attenzione, durante la movimentazione del prodotto, onde evitare di

dan

neggiare la pietra, si consiglia di appoggiare sempre i diversi elementi su 

una superficie protettiva.

Take care when handling this product to avoid damaging the stone, particularly 

the edges. We recommend placing it on a protective surface such as cardboard 

or a sheet.

IMPORTANTE! 

Leggere con attenzione prima di iniziare l’installazione 

Vorremmo richiamare la vostra attenzione sui punti 5 e 6 di questo documento:

• 

Il massetto cementizio deve essere predisposto in modo tale che, una

volta posato il piatto in acciaio di sostegno, le doghe in pietra siano 

perfettamente livellate ed in bolla.

• 

La malta magra deve essere applicata in modo tale da creare un

massetto cementizio che non presenti spazi fra il piatto in acciaio ed il 

massetto stesso.

• 

Le guide di supporto delle doghe devono essere livellate e tali da

garantirne la perfetta complanarità senza consentire flessioni.

La corretta esecuzione di questi passaggi è fondamentale. La presenza di 

spazi d’aria fra il piatto in acciaio ed il massetto o la non complanarità delle 

guide possono comportare possibili flessioni delle doghe che col tempo ne 

potrebbero causare la rottura.

Installazione / 

Installation

1.  Regolare i piedini di appoggio della base 

in modo che, una volta appoggiato il 
piano in pietra, questo risulti in bolla. 

Regulate the adjustable supports at

the base of the legs to ensure that the
structure is perfectly level.

Nota! / 

Note!

Attenzione, durante la movimentazione del prodotto, onde evitare di danneggiare la
pietra, si consiglia di appoggiare sempre i diversi elementi su una super

ficie 

protettiva.

Take care when handling this product to avoid damaging the stone, particularly the
edges. We recommend placing it on a protective surface such as cardboard or a
sheet. Ideally installation should be carried out by two people.

2. Appoggiare il piano del tavolo sulle 

gambe in metallo. / 

Place the top on the

metal legs.

LxPxH - 240x120x72 cm

LxDxh - 94.5x47.2x28.4 in

LxPxH - 300x150x72 cm

LxDxh - 118.1x59.1x28.4 in

Nota! / 

Note!

Si consiglia di far eseguire l’installazione a personale qua

lific

ato.

Installation should only be carried out by 

qualifie

d tradespeople.

Nota! / 

Note!

Fare attenzione al peso del piano in pietra.

Remember that the stone top weighs a 

signific

ant amount.

x 2 

The Filo Flush shower tray comes supplied as follows:

Carton 1

1 x stainless steel tray (A)

Kit containing:

1 x Viega 6963.1 self-cleaning waste (33 litres / minute) and accompanying lea

fl

et 

(B), 1 x tube of silicone sealant (C), rubber strips (quantity 6 for models 3| 80 and 3 

| 100, quantity 8 for models 4 | 80 and 4 | 100, quantity 10 for models 5 | 80 and 5 | 

100) (D), 1 x customised lever (F), instruction manual (G).

For models 3 | 80 and 3 | 100

Carton 2

3 x stone slats (E)

For models 4 | 80 and 4 | 100

Cartons 2 and 3

2 x stone slats (E)

For models 5 | 80 and 5 | 100

Carton 2

2 x stone slats (E)

Carton 3

3 x stone slats (E)

Summary of Contents for FILO 3 | 100

Page 1: ...s Via Aurelia 395 E 55047 Querceta LU Italy salvatori it info salvatori it 39 0584 769 200 Via Aurelia 395 E 55047 Querceta LU Italy salvatori it info salvatori it 39 0584 769 200 FILO PIATTO DOCCIA A FILO PAVIMENTO FLUSH SHOWER TRAY ...

Page 2: ...document has been designed to ensure a problem free installation which we recommend is carried out by a qualified tradesperson These instructions cover the following models FILO 3 80 FILO 4 80 FILO 5 80 FILO 3 100 FILO 4 100 FILO 5 100 A practical and supremely simple to install shower tray Filo utilises our revolutionary concept which we like to call Plug Play simply because it really is that eas...

Page 3: ...3 100 FILO 4 100 FILO 5 100 Misure dello scasso a pavimento 1050 x 950 mm Dimensions of cavity required 41 3 x 37 4 Misure dello scasso a pavimento 1050 x 1250 mm Dimensions of cavity required 41 3 x 49 2 Misure dello scasso a pavimento 1050 x 1550 mm Dimensions of cavity required 41 3 x 61 Dimensioni piletta Viega Viega waste dimensions ...

Page 4: ... C guarnizioni in gomma per i supporti delle doghe n 6 per i modelli FILO 3 80 and 3 100 n 8 per i modelli FILO 4 80 and 4 100 n 10 per i modelli FILO 5 80 e 5 100 D n 1 chiave per la rimozione delle doghe F n 1 manuale di montaggio G Per i modelli FILO 3 80 and 3 100 Scatola 2 n 3 doghe in pietra E Per i modelli FILO 4 80 and 4 100 Scatola 2 e 3 n 2 doghe in pietra per scatola E Per i modelli FIL...

Page 5: ...ione del prodotto onde evitare di danneggiare la pietra si consiglia di appoggiare sempre i diversi elementi su una superficie protettiva Take care when handling this product to avoid damaging the stone particularly the edges We recommend placing it on a protective surface such as cardboard or a sheet IMPORTANTE Leggere con attenzione prima di iniziare l installazione Vorremmo richiamare la vostra...

Page 6: ...ng with installation We would draw your particular attention to Steps 5 and 6 of this manual which cover the following points The mortar bed must be created so as to ensure that the slats once in place are perfectly flush The mortar mix must be applied so as to create a mortar bed which is completely compact and solid There should be no unfilled space or air pockets between the stainless steel tra...

Page 7: ...catola a terra in posizione orizzontale con la faccia superiore rivolta verso l alto Tagliare lungo il bordo tratteggiato Tirare fuori la struttura dalla scatola compresi gli angolari di sostegno in modo che possano essere utilizzati per posare il piatto a terra una volta tolto dalla scatola Place the carton on the ground with the top side facing up Cut along the dotted lines indicated and remove ...

Page 8: ... to comfortably accommodate the stainless steel tray and which allows for the thickness of the mortar which will be required to fix the tray in position For definitive dimensions please refer to the section Dimensions Make a square hole in the centre measuring approximately 300 x 300 x 65mm deep to accommodate the waste pipe 2 Realizzazione vano per il piatto doccia Prepare the ground Se necessari...

Page 9: ...l Nota Note Attenzione durante la movimentazione del prodotto onde evitare di danneggiare la pietra si consiglia di appoggiare sempre i diversi elementi su una superficie protettiva Take care when handling this product to avoid damaging the stone particularly the edges We recommend placing it on a protective surface such as cardboard or a sheet Ideally installation should be carried out by two peo...

Page 10: ...hould only be carried out by qualified tradespeople Nota Note Fare attenzione al peso del piano in pietra Remember that the stone top weighs a significant amount Collegare la ghiera della piletta come specificato nella guida di installazione Viega Connect the clamping collar of the waste as per the instructions in the Viega guide 7 Collegamento ghiera Position the clamping collar IMPORTANTE IMPORT...

Page 11: ...azioni di acqua Seal any gap between the floor and the tray to protect against any potential water infiltration see the cross section diagram on page 6 9 Posa del sigillante Apply sealant Kit di completamento Adjustment kit Se il cliente ha acquistato il kit di completamento una volta che il massetto si è seccato incollare il marmo intorno al piatto doccia seguendo il disegno fornito al cliente e ...

Page 12: ...le doghe Lay the slats in place 11 Installazione delle doghe Lay slats 12 Il vostro piatto doccia Filo è pronto all uso Your Salvatori Filo Flush shower tray is ready for use Applicare le guarnizioni di gomma su ogni supporto Apply the rubber casing strips over each ridge of the tray 10 Applicazione guarnizioni di gomma Apply rubber strips ...

Page 13: ...ccasionali più intense come la rimozione dei capelli dallo scarico ad esempio le doghe dei nostri piatti doccia possono essere facilmente sollevate utilizzando l apposita leva in dotazione A Il piatto in acciaio inossidabile che può essere pulito facilmente secondo le vostre abitudini Cleaning a shower tray in natural stone doesn t have to be arduous and in fact requires no more care than other ma...

Page 14: ...eguire l installazione a personale qualificato Installation should only be carried out by qualified tradespeople Nota Note Fare attenzione al peso del piano in pietra 80x90x6 9 cm 80x120x6 9 cm 80x150x6 9 cm 100x90x6 9 cm 100x120x6 9 cm 100x150x6 9 cm 31 4x35 4x2 72 inches 31 4x47 2x2 72 inches 31 4x59x2 72 inches 39 4x35 4x2 72 inches 39 4x47 2x2 72 inches 39 4x59x2 72 inches Nota Note Ogni piatt...

Page 15: ...etra d Avola Bamboo Raw Sabbiato Sandblasted Per questa pietra la f initura non è Sabbiato ma Cotone Gris du Marais is available only in Cotone texture Per qualsiasi ulteriore domanda o chiarimento non esitate a inviarci una e mail all indirizzo customercare salvatori it Should you have any questions or require advice or further information please feel free to email our Customer Care team at custo...

Page 16: ...ITALY T 39 0584 769 200 info salvatori it Showrooms Via Solferino 11 20121 Milan MI ITALY T 39 02 8050 0372 milano salvatori it 26 Wigmore St London W1U 2RL UNITED KINGDOM T 44 020 748 684 91 info salvatoriuk com salvatori_official info salvatori it ...

Reviews: