Maintenance work and tests
Page 33/55
8.4
Maintenance intervals
Assignment of the maintenance areas where maintenance work must be carried out:
Pos.
Naming
1
Plasma module
2
High-voltage generation
3
Control unit
Figure 9, Components of the system
Component,
assembly
Activity
A
nn
ua
l
7
-yea
rl
y
ind
ivi
du
al
Time re-
quired
in min.
Total
System (1, 2, 3)
Maintain cleanliness, visually check system
components for function/damage, check control
unit for cable fires.
X
X
4
Ionisation
module (1)
If necessary, clean (if not already done), thor-
ough function check/check for damage
X
X
2
High voltage
generator (2)
If necessary, clean (if not already done), thor-
ough function check/check for damage
X
X
2