Doc.-ID: 220518-PT20BAU-SS-Ex Installation Manual rev.01.docx, Page 3 of 24
Table of Figures and Charts
Table 2-1: T20 electrical input supply (T6 and T5) ............................................................ 6
Table 2-2: T20 power supply (T4 and T3).......................................................................... 7
Fig. 6-1: T20-VA1.1 to VA2.2. Mounting options ............................................................. 12
Fig. 6-2: T20-VA2.3 Safety wire ....................................................................................... 13
Fig. 6-4: Opening the liteServer
®
T20-VAx.x.x.x .............................................................. 14
History of revisions
Product:
T20 - liteServer
®
Series
Title:
T20 - Ex Installation Manual
Doc.
-Id.
220518-PT20BAU-SS-Ex Installation Manual rev.01.docx
Author:
Steffen Seibert, Grad. Eng.
Created on:
May 18
th
, 2022
Last update:
April 25
th
, 2023
Rev.- Index
Date
Name
Comment
Approved by the EX Supervisor
00
18.05.2022
S.Seibert
Compilation of the document
01
25.04.2023
E. Schneider
Several corrections
Digital unterschrieben
von Steffen Seibert
DN: cn=Steffen Seibert,
o=SAMCON
Prozessleittechnik GmbH,
ou,
email=s.seibert@samcon.
eu, c=DE
Datum: 2023.04.28
10:56:11 +02'00'