8. FIRST PLACING INTO OPERATION
During that first placing into operation, it is compulsory to have all the pumps
into solvent as well as the CYCLOMIX
TM
MICRO to ensure the good quality of
the fluid get by the CYCLOMIX
TM
MICRO.
The fluid pressure must not exceed 20 bar / 290 psi.
We advice you to install the TB fitting (provided with the CYCLOMIX
TM
MICRO)
instead of the mixer.
FLUSHING OF THE PUMPS AND OF THE CYCLOMIX
TM
MICRO INTO SOLVENT
•
Carry out the connections indicated at § 5 (INSTALLATION).
•
Check that the three way-valve is turned towards 'TA'.
•
Remove the static mixer to install, instead of it, the adapter fitting (marked TB, F 3/4 JIC - F 1/4
G).
•
Start the pumps with solvent and increase the fluid pressure to 1 bar / 14.5 psi.
•
On the page of the display main menu, input "PRODUCTION MODE" ( F-1 then
↵
).
•
Do not change the factory parameters for the moment.
•
Make the CYCLOMIX
TM
MICRO mix until the solvent flows out clean. During that stage, the
CYCLOMIX
TM
MICRO must be in fault due to air presence into hoses. In case of alarm, acquit,
then go to production mode.
CAUTION : shut off air turning the valve that has been mounted to the gun air inlet (Cf. § 5)
•
Quit the production mode passing to ESC.
•
Repeat the 4 stages previously indicated, when using a 3 shades' CYCLOMIX
TM
MICRO, with all
the shades (A2 and A3).
START-UP OF THE CYCLOMIX
TM
MICRO
•
Check that the three way-valve is turned towards 'TA'.
•
Start the pumps.
•
Pass to production and let the fluid flow until it flows clean. In case of alarm, acquit then go to
production.
CAUTION : shut off air turning the valve that has been mounted to the gun air inlet (Cf. §
5).
•
Repeat the stages previously indicated, when using a 3 shades' CYCLOMIX
TM
MICRO, with all
the shades (A2 and A3).
•
Carry out a flushing before cleaning the 3 way-valve. As soon as the solvent is clean, pass to
ESC.
From now on you can enter your parameters of application.
After that first placing into operation, you must carry out a flushing to clean the 3
way-valve. During the flushing, flush correctly the TA side of the valve, then turn
the 3 way-valve to IN to flush the fitting at the outlet of the injector.
Once the first placing into opeartion and the flushing carried out, install the mixer
and leave the 3 way-valve on IN.