Index revision : A
7
7129
• The device can only be operated if it is in perfect condition. Any damaged equipment
must be immediately removed from active service and repaired.
Worn parts must be immediately replaced.
• Closely follow use guidelines for the paints and solvents being applied (e.g. wear a mask).
• Close and purge both the air and paint inlet prior to any extended equipment downtime.
• Before any cleaning or maintenance operation, discharge the equipment to earth (the
discharge is done automatically if the door is open).
• Verify the good working order of the paint hose prior to any equipment start-up.
1.7. Maintenance rules
• Regularly maintain and repair the electrostatic projection equipment according to the
instructions contained in this user’s manual.
• Only use metal containers to hold the cleaning liquids and connect to ground according
to a safe procedure.
• Before any maintenance procedure:
1 Power down the generator.
2 Dump the paint circuit.
3 Verify that the air and paint circuits are no longer pressurised.
4 All energy sources must be locked out.
• Clean the equipment either in their dedicated spots with mechanical ventilation or by
using cleaning liquids with a flash point at least 15°C higher than ambient temperature.
• Use non-flammable cleaning products.
WARNING : It is strictly prohibited to use solvents derived from halogenated hydrocarbons as
well as products containing these solvents in the presence of aluminium or zinc.
Failure to comply with these guidelines exposes the user to the risks of explosion.