19
Member of Exel group
DRT7159
B - 2023/03
6.1.1.
Inocart VT
dual version
•
Step 1
: Place the wall bracket on the cabin wall.
•
Step 2
: Install the dual plunger wiring set.
•
Step 3
: Install the 2nd
Inobox
control module and
•
Step 4
: Connect the
Inogun M
6 m to the
Inobox
.
•
Step 5
: Install the support of the 2 tubes on the
support arm.
•
Step 6
: Install the 2 tubes equipped with the 2 CS130
pumps, connect the 2 tubes to the second powder
pump, blue to blue, red to red.
Connect the fluidizing hose to the tube.
•
Step 7
: Connect the powder hose of the 2nd gun to
the 2nd pump CS 130 and connect the electrode
blowing hose on the
Inobox
control module side and
on the gun side.
•
Step 8
: Connect the power supply cable of the
second
Inobox
.
Summary of Contents for Inocart VT
Page 1: ...Instruction manual DRT7159 B 2023 03 Inocart VT Inocart H Cart for powder gun...
Page 34: ...34 Member of Exel group DRT7159 B 2023 03 9 1 Equipment Inocart VT 1 2 3 4...
Page 40: ...40 Member of Exel group DRT7159 B 2023 03 9 2 Equipment Inocart H 1 2 3 4 5 1 5 1 7...
Page 48: ...9 3 1 Inocart VT Dual cart Europe US 1 13 1 9 1 6 1 2 1 4 7 1 8 1 12 1 11 1 10 1 10 1 3...
Page 54: ...54 Member of Exel group DRT7159 B 2023 03 11 Appendices 11 1 Maintenance preventive plan...
Page 62: ...55 Member of Exel group DRT7159 B 2023 03 11 2 EU and UK declarations of conformity...