18
Member of Exel group
DRT7159
B - 2023/03
6. Installation
The
Inocart VT
or
H
carts are delivered assembled.
6.1. Vibrating table version
•
Step 1
: Place the support arm in its housing.
•
Step 2
: Place the plunger tube (A) equipped with the
CS 130 pump in the support arm and connect the 2
hoses to the powder pump blue to blue, red to red.
Connect the fluidizing hose to the tube.
•
Step 3
: Connect the 5 m earthing cable to an
electrically earthed part of the application booth.
•
Step 4
: Connect the
Inobox's
power supply plug.
•
Step 5
: Connect the powder supply hose from the
gun to the CS 130 pump and connect the electrode
blowing hose on the
Inobox
module side and on the
gun side.
The
Inocart
cart is ready to start the powder application.
A
Summary of Contents for Inocart VT
Page 1: ...Instruction manual DRT7159 B 2023 03 Inocart VT Inocart H Cart for powder gun...
Page 34: ...34 Member of Exel group DRT7159 B 2023 03 9 1 Equipment Inocart VT 1 2 3 4...
Page 40: ...40 Member of Exel group DRT7159 B 2023 03 9 2 Equipment Inocart H 1 2 3 4 5 1 5 1 7...
Page 48: ...9 3 1 Inocart VT Dual cart Europe US 1 13 1 9 1 6 1 2 1 4 7 1 8 1 12 1 11 1 10 1 10 1 3...
Page 54: ...54 Member of Exel group DRT7159 B 2023 03 11 Appendices 11 1 Maintenance preventive plan...
Page 62: ...55 Member of Exel group DRT7159 B 2023 03 11 2 EU and UK declarations of conformity...