35
DRT7133
D - 2023/01
Member of Exel group
6.4. Replacement
6.4.1. Procedure B1: Replacement of air nipple
•
Step 1
: If the projector falls, check the condition of the
air nipple:
•
Step 2
: Unscrew the air nipple with a 5 mm hexagon
wrench. Replace if necessary.
When replacing the O-ring (A), for reassembly, use the
seal assembly tool (B) (P/N: 900018753).
6.4.2. Procedure B2: Holding flange
• Unscrew the 4 M4x 20 screws with a 3 mm allen
wrench and remove the holding flange from the rear
body.
Check the condition of the O-Ring, replace it if
necessary.
• For reassembly, tighten the screws crosswise and
then tighten to 2,5 N.m.
A
B
Summary of Contents for inocoat Inogun A
Page 1: ...Instruction manual DRT7133 D 2023 01 Inogun A FCC Standard and Robotic Versions...
Page 78: ...78 Member of Exel group DRT7133 D 2023 01 10 Appendices 10 1 Preventive maintenance plan...
Page 82: ...79 DRT7133 D 2023 01 Member of Exel group 10 2 EU and UK declarations of conformity...
Page 87: ...Sames 13 Chemin de Malacher 38240 Meylan France 33 0 4 76 41 60 60...