After connecting to AC and DC
power the inverter presents the
screen on the left.
Press OK to start
commissioning.
Select the language.
3UHVV2.WRFRQ¿UP
Select the country.
3UHVV2.WRFRQ¿UP
<<<<
/HIW5LJKW0RYHVHOHFWLRQ
8S'RZQ,QFUHDVH'HFUHDVH9DOXH
End Commissioning
Date/Time
- - -
Specify Date and Time.
3UHVV2.WRFRQ¿UP
(QGRI&RPPLVVLRQLQJ
3UHVV2.WRFRQ¿UP
The inverter performs self-tests
and checks the AC-grid.
The inverter starts operation after
a few minutes.
See page 22 for changing the
settings.
SamilPower Co., LTD
.
987654000
V1.83
V1.10
6ODYH'636:
V1.83
Press OK to start commissioning.
English
Language
3UHVV2.WRFRQ¿UP
Country
DE - VDE 4105
MM
DD
2 0 1 4 - 0 1 - 1 5
hh mm
3UHVV2.WRFRQ¿UP
3UHVV2.WRFRQ¿UP
Press OK to start running
Press ESC to back
EN
Commissioning
Press Esc to Main Menu
IT - CEI 0-21
AU - AS 4777
ES - RD 1699
CZ - EN 50438
GR - Islands
GR - Continent
NL - EN 50438
&XUUHQW&RXQWU\
DE - VDE 4105
3UHVV2.WRFRQ¿UP
&XUUHQW&RXQWU\
DE - VDE 4105
German
French
Spanish
Italian
kWh
9.75
49.99
Hz
581.7
V
10.0 kWh (%)
Normal
Total