17
Installation
●
Little or no air flow and high humidity.
●
Exposed to steam, vapor, or water.
●
Exposed to direct cool air.
●
Near the television antenna or antenna cable.
●
Table 2
Available Space Size
Position
Min. Size
Side
30cm
Top
30cm
Bottom
30cm
Front
10cm
6.3 Preparation
Below tools are needed before installation.
Installation Tools
6.4 Installation Steps
Step1:
Ventilation is not enough to cool the inverter, that is to say, outdoors, the inverter requires.
At least 30 cm (see table 2) of clearance among the units is needed, it is recommended
that the same clearance between the units and the ground be used. Installing the inverter
in the place mentioned above may cause the malfunction of the system caused by water
or high temperature inside the inverter. Please let users know that Samil Power will not
compensate the fault caused by the above situation.
Installation Tools: crimping pliers for binding post and RJ11, screwdriver and manual wrench
and ф 6 driller.
Drill holes in the wall with ф 6 driller according to the size of bracket. Keep drilling
vertical to the wall, and don’t shake when drilling to avoid damage to the wall.
SolarRiver
SolarRiver
SR5KTLA1
Function
Normal
Fault
30cm
30cm
30
cm
30
cm
10cm