23
Installation
Step5:
Screw down the pressure screw (Figure 18).
Step6:
Connect AC connector to inverter (Figure 19).
Figure 19
● Start inverter
Figure 18
6.6 Run the inverter
● Start inverter after checking all below steps.
a. Make sure all the DC breaker and AC breaker are disconnect.
b. AC cable is connected to grid correctly.
c. All PV panels are connected to inverter correctly
,
DC connectors which are not used
sealed should be sealed by cover.
a. Turn on DC and AC side switches.
b. Inverter will start up automatically when PV panels generate enough energy. Below is
three different states when operating, which means inverter starting up successfully.
Waiting:
Inverter is waiting to checking when output DC voltage from PV panels is