3-7. Inverter Operation
To operate the power inverter, use the ON / OFF switch on the Front panel to
turn the power on. Then the power inverter is ready to deliver AC power to
your loads. If there is several loads use, turn them on separately after the
inverter is “ON” in order to prevent OVP resulted from the surge power.
3-7-1. Set the power switch to “ON” position and the buzzer will send out
“Beep” sounds at the moment. Then the inverter will make self-
diagnosis, and the LED’s indicators will also appear various colors.
Finally the buzzer will “Beep” again and the Input Level and Status
LED indicators will turn to “Green” color, then the inverter starts to
work successfully.
3-7-2. Set the power switch to the OFF position, then the inverter stops and
all the lights go Off.
3-7-3. Set the power inverter switch to ON position and turn the test load On.
The inverter should supply power to the load. If you plan to
accurately measure the true output r.m.s. voltage of the inverter, a
meter such as FLUKE 45 BECKMAN 4410 or TRIPLETT 4200 must be
used.
18