PRESSIONE MASSIMA 230 bar
MAX PRESSURE 3335 PSI
20705
1006
230Vac 50Hz 2.8Kw
WWW.LARIUS.COM
Should anyone use an extension cable between
the tooling and the socket, it must have the same
characteristics as the cable supplied (minimum
diameter of the wire 4 mm2) with a maximum length
of 50 mt. Higher lengths and lower diameters
can provoke excessive voltage falls and also an
anomalous working of the equipment.
Before carrying out any checks on the machine
(maintenance, cleaning, or replacing parts) switch
off the machine and wait until it has stopped
altogether.
While checking stay away from electrical or moving
parts to avoid any risk of shock or crushing of hands.
WARNING :
• DO NOT modify the plug for the earth socket in
any way.
• ONLY use electrical connections that are earthed.
• Make sure that any earth extension cords are in
good condition.
• ONLY use three-core extension cables.
• Avoid direct contact with the rain. Keep the
equipment in a dry place.
H4
Volt
•
The supply cable is provided without plug.
Use a plug which guarantees the plant earthing.
Only a technician or a skilled person should perform the
connection of the plug to the electric cable
.
To avoid electric shock when disassembling or checking the
electronic equipment, wait 5 minutes after having disconnected
the power supply cable, so that the electricity stored in the con
-
densers while working can be dissipated
.
Also check the condition of the earth cable to avoid any risk of
shock
.
THOR equipment is fitted with an additional external earth cable
that is connected to the stem on the pump unit be means of a
specific clamp (
H4
), in order to protect the operator against any
risk of static or electric shock
.