EB 2520 EN
21
Mounting and start-up
5
Mounting and start-up
5.1
Installing the valve into the
pipeline
5.1.1
Installation conditions
− Choose a place of installation that allows
you to freely access the regulator even
after the entire plant has been complet-
ed.
−
The type and dimensions of the pipeline
and tank connections must suit the regu-
lator.
min.
6 x DN
min. 12 x DN
DN
2
2
1
p
1
1
2
1
1
p
1
p
2
3
3
2
4
4
p
2
min.
5 x DN
~10 % slope to
pressure tapping
point
~10 % slope to pressure
tapping point
1 Shut-off valve
2 Pressure gauge
3 Strainer
4
Control line
Fig. 7:
Installation example
− Make sure the direction of flow matches
the direction indicated by the arrow on
the body.
−
Install the regulator free of stress and
with the least amount of vibrations as
possible. If necessary, support the pipe-
line near to the connecting flanges. Do
not attach supports directly to the valve
or actuator.
−
Protect the regulator from icing up when
controlling media that can freeze. Unless
the regulator is installed in locations
where no frost occurs, remove the regu-
lator from the pipeline when the plant is
shut down.