![background image](http://html.mh-extra.com/html/samsung/136s/136s_installation-manual_21064151.webp)
Confidential
3
.
Installing the Product
English 8/2019. Rev 0.0
133
3.10.15
Reinstall the Front Panel
1.
Reinstall the front panel to cover the battery rack and prevent further access to high voltage parts of the battery modules.
2.
Locate the hooks that hold the front panel to the slots in the rack frame and insert the front panel to the rack frame. Make
sure all the hooks are inserted to the slot and the panel is flush with the rack frame before screwing.
Figure 3-167: Front panel hooks (four)
3.
Screw in the front panel using the provided M5 screws for each front panel. Fasten the screws using torque of 5.1–6.1 Nm
(50–60 kgf/cm)
Figure 3-168: Front panel screws (eight)
Summary of Contents for 136S
Page 1: ...Confidential English 8 2019 Rev 0 0 LIB System for UPS Installation Manual 136S ...
Page 4: ...Confidential English 8 2019 Rev 0 0 ...
Page 10: ...Important Safety Instructions Confidential vi English 8 2019 Rev 0 0 ...
Page 18: ...Confidential Table of Contents viii English 8 2019 Rev 0 0 ...
Page 153: ...Confidential Memo ...
Page 154: ...Confidential Memo ...
Page 155: ...Confidential Memo ...
Page 156: ...www SamsungSDI com ...