Confidential
Chapter 2 Installing System
5G NR HRU Installation Manual v1.0
57
Copyright © 2018, All Rights Reserved.
Figure 58.
Lifting HRU (1)
2
While Operator A hauls the rope to carry up the HRU, Operator B pulls the
rope outward, so that the HRU would not hit the tower platform.
3
Operator C locates the carried HRU to the installation position.
[Rear Side]
Carrying Point_1
For Eye Bolt
Carrying Point_2
For Handle
Carrying Point_1
For Eye Bolt
[Rear Side]