Confidential
Chapter 2 Installing System
5G NR HRU Installation Manual v1.0
81
Copyright © 2018, All Rights Reserved.
1
Tie the rope in two carrying points of the HRU.
Figure 85.
Lifting HRUs (1)
2
While Operator A hauls the rope to carry up the HRUs, Operator B pulls the
rope outward, so that the HRU would not hit the tower platform.
[Rear Side]
Carrying Point_1
For Eye Bolt
Carrying Point_1
For Eye Bolt
[Rear Side]
Carrying Point_2
For Handle