Chapter 3 Connecting Cables
5G NR HRU Installation Manual v1.0
86
Copyright © 2018, All Rights Reserved.
Guidelines for Cable Connections
The figure below depicts the sequence of operations for connecting cables to the
system:
Figure 90.
Cable Connection Procedure
When cutting the cable after installation, ensure that the connector is disconnected.
The cable installation while the connector is connected to the system may cause
contact failure, or damage to the assembled connector and the cable, due to cable
tension or operator mistakes.
The sequence of cable cutting and installation of the cable workflow can be
changed depending on the field situation such as cutting after installing or
installing after cutting.
Cable Path Inspection
When installing the cable that interconnects rectifier, Main Ground Bar (MGB),
backhaul device, and so on within the system, the cable path, length, and cable
installation method must be inspected.
To inspect the cable path, ensure the following.
A minimum cable length must be selected, so that the length does not affect
the cable installation and maintenance.
Cable Installation
Connector Attachment
Identification Tag Attachment
Connector Assembly
When assembling the
connector at the site
Cable Path Inspection
Cable Cutting
Cable Binding