3
.
Installing the Product
106
English 8/2020. Rev 0.3
3.10.15 Reinstall the Front Panel
1.
Reinstall the front panel to cover the battery rack and prevent further access to high voltage parts of the battery modules.
2.
Locate the hooks that hold the front panel to the slots in the rack frame and insert the front panel to the rack frame. Make
sure all the hooks are inserted to the slot and the panel is flush with the rack frame before screwing.
Figure 3-135: Front panel hooks (four)
3.
Screw in the front panel using the provided M5 screws for each front panel. Fasten the screws using torque of 5.1–6.1 Nm
(50–60 kgf/cm)
Figure 3-136: Front panel screws (eight)
Summary of Contents for 93PM
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...Memo ...
Page 129: ...www SamsungSDI com ...