3
.
Installing the Product
40
English 8/2020. Rev 0.3
3.10.4
Fuse-Busbar Assembly
Three types of fuse-busbar assemblies must be assembled before installing them to the Battery Modules.
NOTICE
Rack Fuse Busbar Assembly is assembled at the installation location.
M12 X 16L screws are used to assemble the busbars and fuse.
The fastening torque should be 30 Nm (300 kgf/cm).
After torqueing, torque mark the screws using a colored marker or a torque seal.
When assembling the fuse, make sure the “red indicator arm” on the fuse is facing the front of
the unit.
1.
Assemble the Rack fuse Bus-bar assembly.
Rack fuse bus-bar assembly is comprised of one “RACKFUSE BUSBAR_R_136S”, one “RACKFUSE BUSBAR_L_136S”, two
“SCREW M12 X 16”, one “FUSE COVER #1”, and one “FUSE”
Figure 3-30: Rack Fuse Busbar Assembly
Figure 3-31: Rack Fuse Busbar Assembly (Fuse Cover)
Summary of Contents for 93PM
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...Memo ...
Page 129: ...www SamsungSDI com ...